Data Centres

CDC currently operates 4 data centres across two data centre campus – Fyshwick and Hume.

The construction of the 4 th Data Centre in Hume is underway with occupancy available in June/July 2016. Fyshwick 4 is currently in the detailed design phase with construction expected to be completed mid 2017.

 

CDC Fyshwick 1

Location: Canberra, Australia
Data Center Space: 5000 m2
Power for IT load: 13.5 MW


 

 


 

CDC Hume 1

Location: Canberra, Australia
Data Center Space: 1500 m2
Power for IT load: 4.5 MW


 


 

CDC Hume 2

Location: Canberra, Australia
Data Center Space: 2000 m2
Power for IT load 4.5 MW